Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Various Intersection Improvements
Last Updated: 04/29/2024 Category: 巷道 当前阶段: Design Development
The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, Cochran Boulevard, Peachland Boulevard, and Veterans Boulevard.
Manasota Key Sidewalk, Lighting & 景观
Last Updated: 04/29/2024 Category: 人行道上 Category: 景观 Category: 其他 当前阶段: Design Development
Gulf Boulevard Sidewalk, Lighting & 景观Midway Boulevard Sidewalk (HB41)
Last Updated: 04/29/2024 Category: 人行道上 当前阶段: Planning and Project Approval
Midway Boulevard sidewalk and pedestrian bridge.Landfill Scale House (Zemel 路)
Last Updated: 04/29/2024 Category: County Facilities 当前阶段: 建设
The scale house at the Zemel 路 Landfill is currently a trailer nearing end of expected usable lifecycle. 另外, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.
Last Updated: 04/29/2024 Category: 巷道 当前阶段: Planning and Project Approval
Sandhill Blvd WideningLast Updated: 04/29/2024 Category: Sales Tax Funded Category: 人行道上 当前阶段: Planning and Project Approval
The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.Last Updated: 04/29/2024 Category: Sales Tax Funded Category: 人行道上 当前阶段: Planning and Project Approval
Design and construct a sidewalk on Airport Rd. as part of the 2020 sales tax CIPLast Updated: 04/29/2024 Category: 人行道上 当前阶段: Planning and Project Approval
Gulf Cove 人行道上